PIT
HIERARCHY
Hierarchy Name | FUNCT |
System Name | SOLID WASTE |
Subsystem Name | COLLECTION |
Asset Name | PIT |
Acronym | PIT |
ADS Code | FUNCT18A-PIT |
Definition | PIT (Point-in-Time) in a solid waste system refers to a specific moment when the collection of waste is recorded or assessed to monitor and evaluate the efficiency and effectiveness of the waste collection process. |
FLOW Enabled | False |
Service Life | 10 YEARS |
Equipment Utilization | 5,000 HOURS |
STANDARD CROSSWALK
ACRM Asset Class Number | Reference cannot be found! |
ACRM Asset Description | Reference cannot be found! |
ACRM Asset Useful Life (yr) | Reference cannot be found! |
UniFormat 2010 Code (Option 1) | Reference cannot be found! |
UniFormat 2010 Code (Option 2) | Reference cannot be found! |
REQUIRED ASSET RECORDS
ENGINEERING ATTRIBUTES TABLE
Description | Attribute (ASSETATTRID) | UNIT OF MEASURE | DATA TYPE | DOMAIN ID |
---|---|---|---|---|
DRAWING NUMBER | PIT_03 | N/A | ALN | |
OPENING LENGTH | PIT_01 | IN | NUM | |
OPENING WIDTH | PIT_02 | IN | NUM |
ASSET SUB TYPE AND ATTRIBUTES TABLE
PIT | |
DRAWING NUMBER | |
OPENING LENGTH | |
OPENING WIDTH |
CHILD ASSETS
COMPONENTS & SPARE PARTS
UPDATES LOG
Operation Type | Type of Change | Old Value | New Value | Update Recorded (EST) |
---|---|---|---|---|
Edit | CLASSIFICATION | PIT | 4/2/2025 11:35:57 AM | |
Edit | DEFINITION | PIT (Point-in-Time) in a solid waste system refers to a specific moment when the collection of waste is recorded or assessed to monitor and evaluate the efficiency and effectiveness of the waste collection process. | 12/20/2024 3:46:32 PM | |
Create | ADS CODE | FUNCT18A-PIT | 5/22/2024 12:33:12 PM | |
Create | ASSET NAME | PIT | 5/22/2024 12:33:12 PM | |
Create | ACRONYM | PIT | 5/22/2024 12:33:12 PM | |
Create | PARENT (SUBSYSTEM) | COLLECTION | 5/22/2024 12:33:12 PM | |
Create | FLOW Enabled | False | 5/22/2024 12:33:12 PM |