VIDEO WALL

HIERARCHY

Hierarchy Name FUNCT
      System Name FUNCTIONAL SPACES
            Subsystem Name BACK OF HOUSE
                  Asset Name VIDEO WALL
                  Acronym VDWL
                  ADS Code FUNCT07B-VDWL
                  Definition A video wall in the back of house of a functional spaces system refers to a large, multi-screen display setup used for monitoring, control, and coordination of operations and logistics.
                  FLOW Enabled False
                  Service Life 10 YEARS
                  Equipment Utilization 40,000 HOURS

STANDARD CROSSWALK

ACRM Asset Class Number Reference cannot be found!
ACRM Asset Description Reference cannot be found!
ACRM Asset Useful Life (yr) Reference cannot be found!
UniFormat 2010 Code (Option 1) Reference cannot be found!
UniFormat 2010 Code (Option 2) Reference cannot be found!

REQUIRED ASSET RECORDS


ENGINEERING ATTRIBUTES TABLE

Description Attribute (ASSETATTRID) UNIT OF MEASURE DATA TYPE DOMAIN ID
AMPERAGE DISPLAY_07 AMP NUM
CABINET TYPE DISPLAY_03 N/A ALN
DEVICE ID DISPLAY_08 N/A ALN
DISPLAY TYPE DISPLAY_09 N/A ALN
DRAWING NUMBER DISPLAY_02 N/A ALN
FIRMWARE REVISION DISPLAY_10 N/A ALN
INSTALLED OS DISPLAY_11 N/A ALN
INSTALLER NAME DISPLAY_12 N/A ALN
RACK ELEVATION DISPLAY_04 N/A ALN
ROOM TYPE DISPLAY_05 N/A ALN
SIZE DISPLAY_01 IN ALN
SOFTWARE DRIVER REVISION DISPLAY_13 N/A ALN
SOFTWARE NAME DISPLAY_14 N/A ALN
SOFTWARE VERSION DISPLAY_15 N/A ALN
TYPE DISPLAY_06 N/A ALN
VOLTAGE DISPLAY_16 V NUM

ASSET SUB TYPE AND ATTRIBUTES TABLE

DISPLAY
AMPERAGE
CABINET TYPE
DEVICE ID
DISPLAY TYPE
DRAWING NUMBER
FIRMWARE REVISION
INSTALLED OS
INSTALLER NAME
RACK ELEVATION
ROOM TYPE
SIZE
SOFTWARE DRIVER REVISION
SOFTWARE NAME
SOFTWARE VERSION
TYPE
VOLTAGE


CHILD ASSETS


COMPONENTS & SPARE PARTS

UPDATES LOG

Operation Type Type of Change Old Value New Value Update Recorded (EST)
Edit CLASSIFICATION DISPLAY 4/2/2025 2:26:26 PM
Edit DEFINITION A video wall in the back of house of a functional spaces system refers to a large, multi-screen display setup used for monitoring, control, and coordination of operations and logistics. 12/20/2024 3:46:32 PM
Create ADS CODE FUNCT07B-VDWL 12/2/2024 2:05:02 PM
Create ASSET NAME VIDEO WALL 12/2/2024 2:05:02 PM
Create ACRONYM VDWL 12/2/2024 2:05:02 PM
Create PARENT (SUBSYSTEM) BACK OF HOUSE 12/2/2024 2:05:02 PM
Create FLOW Enabled False 12/2/2024 2:05:02 PM