EROSION CONTROL

HIERARCHY

Hierarchy Name FUNCT
      System Name STRUCTURES
            Subsystem Name SUBSTRUCTURE
                  Asset Name ABUTMENT
                        Component Name EROSION CONTROL
                        Acronym ESNC
                        ADS Code FUNCT15A-ABTMT.ESNC
                        Definition Erosion control in the context of an abutment within a substructure system refers to the implementation of measures designed to prevent soil loss and stabilize the ground around the abutment, ensuring the structural integrity and longevity of the construction.
                        FLOW Enabled False

UPDATES LOG

Operation Type Type of Change Old Value New Value Update Recorded (EST)
Edit Definition Erosion control in the context of an abutment within a substructure system refers to the implementation of measures designed to prevent soil loss and stabilize the ground around the abutment, ensuring the structural integrity and longevity of the construction. 12/20/2024 3:46:57 PM
Create ADS CODE FUNCT15A-ABTMT.ESNC 8/9/2024 10:49:45 AM
Create ASSET NAME EROSION CONTROL 8/9/2024 10:49:45 AM
Create ACRONYM ESNC 8/9/2024 10:49:45 AM
Create TYPE Component 8/9/2024 10:49:45 AM
Create PARENT (ASSET) ABUTMENT 8/9/2024 10:49:45 AM
Create FLOW Enabled False 8/9/2024 10:49:45 AM