PANEL
HIERARCHY
Hierarchy Name | FUNCT |
System Name | FUNCTIONAL SPACES |
Subsystem Name | EMERGENCY STAIRWELL |
Asset Name | FLOOD MITIGATION BARRIER |
Component Name | PANEL |
Acronym | PNEL |
ADS Code | FUNCT07E-FDMB.PNEL |
Definition | A panel in the context of a flood mitigation barrier for an emergency stairwell in a functional spaces system is a removable or fixed barrier component designed to prevent water ingress and protect the stairwell from flooding. |
FLOW Enabled | False |
UPDATES LOG
Operation Type | Type of Change | Old Value | New Value | Update Recorded (EST) |
---|---|---|---|---|
Edit | Definition | A panel in the context of a flood mitigation barrier for an emergency stairwell in a functional spaces system is a removable or fixed barrier component designed to prevent water ingress and protect the stairwell from flooding. | 2/3/2025 2:32:11 PM | |
Create | ADS CODE | FUNCT07E-FDMB.PNEL | 1/31/2025 4:40:16 PM | |
Create | ASSET NAME | PANEL | 1/31/2025 4:40:16 PM | |
Create | ACRONYM | PNEL | 1/31/2025 4:40:16 PM | |
Create | TYPE | Component | 1/31/2025 4:40:16 PM | |
Create | PARENT (ASSET) | FLOOD MITIGATION BARRIER | 1/31/2025 4:40:16 PM | |
Create | FLOW Enabled | False | 1/31/2025 4:40:16 PM |